SOTParaguachoa0 min ago
How to read this

Every datum on this panel carries its certainty level in brackets; a datum without a label is a methodological error. If there is no source, the system says "no report" — it never invents.

  • [V]Verified — confirmed against the primary source, in hand.
  • [E]Estimated — three independent sources or a model with a declared method.
  • [P]Proxy — inferred from digital platform footprints.
  • [O]Observation — dated record from the field team.
  • [D]Design — project parameter or decision; it does not measure the world.
  • [S]Synthesis — the project’s interpretation of already-labeled data.
  • [Pr]Projection — a claim about the future with a dated falsification condition.

Every subsystem declares its origin: LIVE (running today), SIMULATED (session maquette only) or DESIGN (specification with a verifiable maturity signal).

LiveSimulatedDesign

Español
S6 · Synthesis — the sum and result of the 8 subsystems

green

4 of 11 indicators have a report today — the rest is declared "no report".

IED — destination index2.57

2.57 / 5 today [O] · 2.8 falsification threshold [Pr] · 4.5 2030 goal (Green Corridor) [Pr]

  1. 2.41/5[E]Starting pointJul 2026
  2. 2.57/5[O]Today — partial measurement v0now
  3. 2.8/5[Pr]Gate-1 — public correction if missedDec 31, 2028
  4. 3.5/5[Pr]Gate-2 — operator termination if missedDec 31, 2030
  5. 4.5/5[Pr]Terminal goal of the Green CorridorOct 12, 2030

Living memory — the latest changes

— clima: rojo → verde — Llovizna — rachas 30 km/h
— clima: verde → rojo — Tormenta — rachas 36 km/h
— sismos: amarillo → verde — M5
— clima: rojo → verde — Llovizna — rachas 42 km/h
— clima: verde → rojo — Tormenta — rachas 40 km/h
— vuelos: sin_reportar → verde — horario publicado hoy (FIDS); radar sin señal

Full record:/v1/eventos· daily history:/v1/historia