SOTParaguachoa0 min ago
How to read this

Every datum on this panel carries its certainty level in brackets; a datum without a label is a methodological error. If there is no source, the system says "no report" — it never invents.

  • [V]Verified — confirmed against the primary source, in hand.
  • [E]Estimated — three independent sources or a model with a declared method.
  • [P]Proxy — inferred from digital platform footprints.
  • [O]Observation — dated record from the field team.
  • [D]Design — project parameter or decision; it does not measure the world.
  • [S]Synthesis — the project’s interpretation of already-labeled data.
  • [Pr]Projection — a claim about the future with a dated falsification condition.

Every subsystem declares its origin: LIVE (running today), SIMULATED (session maquette only) or DESIGN (specification with a verifiable maturity signal).

LiveSimulatedDesign

Español
S3 · Control — audits quality and retains value

Control

The system audits its own quality and defines how much value the island keeps from every tourism transaction. Both instruments are in design, with their parameters declared and their maturity signals verifiable.

The subsystems

Design[Pr]

MGTA

Certification of services and experiences (Margarita Tourism Authority Certified).

Maturity signal: Certified operators published

Under separate development. It mounts in this space once it is alive.

Design[Pr]

Sovereign Retention

The retention ceiling (TRS 20/10), the 50/50 rule and the Community District Fund.

Maturity signal: Community Fund accounts auditable by external audit

Under separate development — the fund formula is the author’s work in progress. It mounts in this space once it is alive.